(2019) PCN Tours KME Fire Trucks in Nesquehoning, PA
00:18 - My name is Brian Connely
00:19 - vice president general
00:19 - manager of KME Fire.
00:22 - We'd like to welcome you to
00:23 - our facility.
00:23 - We're located in
00:24 - Nesquehoning, Pennsylvania
00:25 - which is in Carbon County
00:27 - which is in the start of
00:28 - the Pocono Mountain area.
00:29 - We employ over 600
00:31 - employees here at our
00:31 - facility.
00:33 - We also have facilities in
00:34 - Roanoke Virginia and a
00:35 - maintenance facility and
00:36 - serviced facility in
00:38 - Riverside California as
00:39 - well.
00:40 - What you're gonna be seeing
00:40 - today is our manufacturing
00:42 - process of custom and
00:44 - commercial fire trucks. We
00:45 - build over 300 fire trucks
00:46 - a year. They go all over
00:48 - the world all over the
00:49 - country from east coast to
00:51 - west coast to Alaska to
00:54 - overseas as well.
00:56 - KME Fire was started in
00:57 - 1947 as a two car garage by
01:00 - John Sonny Colebatch and is
01:02 - operated up until recently
01:05 - in 2016 when the Rev group
01:07 - had bought them out
01:08 - purchase them.
01:09 - So today we're KME Fire a
01:10 - division of the revenue.
01:12 - So welcome and enjoy the
01:14 - tour.
01:16 - We're here on our custom
01:17 - fab line where the process
01:19 - starts with us building our
01:20 - custom fire engine cab.
01:23 - Majority of our cabs and
01:24 - vehicles that we make our
01:25 - custom cab.
01:26 - You can see we start with a
01:28 - base section of the cab and
01:30 - slowly weld it up.
01:31 - You can see our folks
01:33 - welding together that piece
01:34 - right now, as you can see
01:40 - we're at the next stage of
01:41 - our cab welding it where
01:43 - you can see a little bit
01:44 - more of the cab taking
01:45 - place.
01:46 - So now what you're seeing
01:48 - is you start seeing it take
01:49 - form with an engine tunnel
01:52 - measuring across for the
01:53 - width of a cab.
01:55 - You can see the back wall
01:57 - to the cab being put
01:58 - together and some of the
01:59 - sidewall again we're
02:04 - further along in our cab
02:05 - process.
02:06 - You start to see the cab
02:08 - taking shape.
02:08 - Now the welding the front
02:10 - portion of the cab the roof
02:12 - come together from what you
02:15 - saw before I can see where
02:17 - the engine will be mounted
02:19 - on the headlight.
02:21 - And he said emergency
02:22 - lighting and obviously the
02:23 - roof structure and so on
02:33 - once the cab welded.
02:35 - This is our final product
02:36 - here.
02:37 - We're getting ready to go
02:38 - in to have everything be
02:40 - sanded down and primer and
02:43 - then painted.
02:44 - But you can see in the
02:45 - inside places where we have
02:46 - our see mounted windows air
02:49 - conditioning just all the
02:51 - structure of the cab itself
02:53 - again from where we started
02:54 - the beginning.
02:56 - Here's where we end up
02:57 - before it goes in our final
02:58 - process for the paint once
03:03 - we get some of our cab.
03:05 - Then we'll come back and
03:06 - get our doors.
03:06 - Our doors are custom as
03:08 - well.
03:09 - We make all these doors
03:10 - here but they'll actually
03:11 - go through fit up the doors
03:13 - and they'll start grinding
03:14 - and welding are taking all
03:16 - the welds down and cleaning
03:17 - up the cab.
03:18 - That's what he's doing here
03:19 - taking off all rough edges
03:21 - and getting them ready to
03:23 - be sanded and primed and
03:24 - painted.
03:24 - We want that nice smooth
03:26 - finish that you'll see once
03:27 - everything's painted so he
03:29 - takes his time and goes
03:30 - through and gets any extra
03:31 - well-marked or any
03:32 - deferring that needs to
03:33 - take place the building our
03:47 - custom cabs everything a
03:49 - lot of the parts actually
03:50 - that go on or are custom as
03:51 - well including our doors.
03:52 - So here you see some of our
03:53 - doors getting put together
03:55 - that we just saw in our
03:56 - cab.
03:57 - So what we're doing here is
03:58 - getting the door framed up
03:59 - and getting ready to weld
04:00 - those components on for a
04:02 - cab door.
04:04 - Once we have them set up in
04:05 - place we'll come over here
04:08 - after they're welded and
04:13 - again doing the same thing
04:14 - taking down any. The
04:17 - barring. All those things
04:18 - to make that smooth finish
04:19 - to have this door primer
04:21 - sanded primer and paint it
04:34 - and then over here we have
04:37 - some of the final doors
04:39 - that are ready to go and be
04:42 - painted and eventually will
04:43 - be put up on our custom map
04:51 - and here we're in our
04:52 - machine shop again.
04:53 - We do a lot of custom
04:54 - parts.
04:55 - So what happens is we
04:56 - actually put a piece of
04:57 - stock material in a machine
04:59 - that's been program and a
05:01 - lot of manically cut what
05:03 - we need and how we need it
05:04 - based off the program.
05:06 - So you'll see the the
05:07 - liquid there that obviously
05:08 - helps lubricate the
05:10 - drillings for this.
05:11 - And we have a whole shop
05:13 - with a few of these
05:13 - machines again when we deal
05:23 - with a lot of custom bars
05:24 - we have a lot of people
05:26 - that are involved with it.
05:27 - Machinist and what not.
05:29 - So what he's doing now is
05:30 - markets apart and actually
05:32 - taking one of our older
05:33 - presses and making the
05:35 - material that we need.
05:54 - Change the bit on it.
05:55 - What he needs and then
05:56 - he'll put a new bit in the
05:58 - appropriate fit and then do
05:59 - what he needs to do.
07:30 - We'll have to we have
07:31 - everything deferred and
07:32 - cleaned up.
07:33 - That's going to come in
07:34 - here where they're going to
07:35 - take it down pleated down a
07:36 - little bit more where
07:38 - they'll get ready to put a
07:39 - primer on the primer goes
07:40 - on just before paint.
07:42 - So we make sure that we
07:43 - have a nice coat covered on
07:45 - our paint and whatnot.
07:49 - So once we get everything
07:50 - cleaned up we'll get ready
07:51 - and bodywork the cab and
07:54 - get ready to have a primer
07:55 - so that primer is the base
07:57 - before it gets painted.
07:58 - So right now this cab is
08:00 - ready to get primer world
08:02 - want to paint which you can
08:03 - see how everything's marked
08:05 - off a nice and smooth and
08:06 - ready for that primer so
08:11 - after we've done our prep
08:13 - you can see a primer cab.
08:15 - So this cab has been primer
08:17 - and it'll get ready to be
08:18 - painted once it goes from
08:21 - here we'll go into one of
08:22 - our paint booths.
08:23 - It will be painted and once
08:25 - it's done paint it being
08:26 - painted it comes out to our
08:29 - group over here.
08:31 - Well they'll go through and
08:32 - again they'll buff the cab
08:34 - they'll inspect it they'll
08:36 - make sure that gets that
08:37 - nice good paint a nice
08:39 - shine to it good quality
08:41 - and so on.
08:42 - So what they're doing is
08:43 - buffing everything down
08:44 - they're checking out
08:46 - anything that they would
08:46 - see imperfections and
08:47 - whatnot.
09:09 - And then over here you'll
09:12 - see some of our our final
09:13 - caps that have been painted
09:16 - after they've been buffed
09:17 - off and inspected.
09:18 - So you see a nice shiny
09:19 - paint red over white.
09:21 - Any color the customer
09:22 - wants.
09:24 - Reds predominant.
09:25 - But again the customer can
09:27 - pick and choose any color
09:29 - that they'd like through
09:35 - this section.
09:36 - We have a lot of pieces and
09:37 - parts that are going
09:38 - together for each truck
09:39 - each vehicle that we do has
09:41 - a number assigned to it and
09:42 - parts tracking so there's a
09:44 - lot of components that go
09:46 - to the vehicle.
09:47 - So down through here we're
09:48 - actually getting components
09:49 - ready.
09:50 - It could be different
09:51 - covers it could be boxes
09:53 - tread plate aluminum and
09:55 - whatnot.
09:55 - So what we're doing over
09:56 - here is we're getting ready
09:57 - to do a compartment for an
09:59 - inside of a cab.
10:00 - So what he's doing is he's
10:01 - laid the compartment out
10:03 - put the parts together as
10:04 - well the fitting a door and
10:06 - whatnot and there's the
10:07 - same process we do for cab
10:09 - again.
10:09 - Things need to be put
10:10 - together welded.
10:12 - They need to be deferred.
10:13 - Ready to be painted.
10:14 - Whatever we need to do.
10:15 - So you'll see him.
10:16 - Like I said fitting a door
10:18 - doing some welding.
10:19 - Whatever he needs to do to
10:20 - fix that or to make that
10:21 - component you'll see some
10:37 - of the doors that we made
10:38 - you'll see some of our door
10:39 - hinges.
10:40 - And again a lot of moving
10:41 - parts do what we do.
10:43 - So these are some of the
10:44 - plates that go on top our
10:45 - doors or inside our door
10:47 - panels that get a
10:49 - reflective stripe on it so
10:51 - that we can see the the
10:52 - interior the door when
10:54 - they're open out on the
10:56 - street.
10:56 - But again pieces that have
10:59 - to get cut they have to get
11:00 - welded bird and whatnot.
11:01 - So he's getting those types
11:02 - of things ready so where we
11:10 - left off before with our
11:11 - cap just being painted
11:12 - right now the caps are on
11:14 - our cap line they're being
11:15 - put together we'll start to
11:17 - see some of the hardware
11:19 - that goes into the doors
11:20 - that we saw being made.
11:21 - They'll do window
11:22 - regulators getting ready
11:23 - for the windows.
11:25 - You'll start to see some
11:26 - trim being done as well
11:27 - where you can see we have
11:29 - some tread plate steps and
11:30 - the final touches getting
11:32 - ready to put some
11:32 - insulation and some foreign
11:34 - material on there.
11:35 - This is all after the cabs
11:37 - been painted with that
11:38 - interior.
11:39 - We're also doing air
11:40 - conditioning unit
11:40 - installation right now so
11:42 - you could see just working
11:43 - on the overhead we started
11:45 - to run our hoses and our
11:47 - setups for the air
11:48 - conditioner.
11:50 - He's up there getting ready
11:51 - to put the unit right on
11:51 - the roof but this is just
11:53 - part of the next step of
11:55 - our capturing process and
12:01 - as we continue through
12:02 - you'll start to see where
12:03 - some of the wiring a lot of
12:04 - the wiring is getting run
12:06 - for the cab.
12:07 - You'll see the AC the air
12:09 - conditioning hoses and as
12:11 - we keep going up further
12:12 - and further on this line
12:14 - you'll start to see more
12:14 - wiring.
12:15 - You'll start to see more
12:16 - lights getting installed on
12:18 - the unit as we just keep
12:20 - progressing.
12:22 - You'll see more of the
12:22 - doors being complete and
12:24 - we'll get to a point we can
12:25 - start seeing some switch
12:26 - panels being done and again
12:36 - more wires we start to see
12:38 - the emergency lights being
12:39 - put on the vehicle on the
12:40 - cab.
12:42 - Again there's so many
12:43 - different variations and
12:44 - configurations of lights
12:46 - for a fire truck.
12:47 - All based on a customer's
12:49 - requirements each
12:50 - customer's a little bit
12:51 - different based on their
12:52 - area based on their what
12:54 - they do.
12:55 - But these folks are
12:56 - actually running some of
12:57 - the air conditioning units.
12:58 - You can see some of the
12:59 - flooring installation
13:01 - that's been installed.
13:02 - They're working on some of
13:03 - the insulation on the back
13:04 - wall right now because we
13:07 - want to keep noise down.
13:08 - We want to obviously make
13:09 - sure that our first
13:10 - responders are kept warm
13:11 - and cold climates and
13:12 - they're also cool in the
13:14 - warmer climates.
13:15 - So a lot goes into into the
13:18 - cab of fire truck as you
13:24 - can see we now have seats
13:26 - mount in the cab.
13:28 - So we have seats that are
13:29 - forward facing and rear
13:30 - facing seats.
13:33 - The air conditioning setup
13:34 - is in as well.
13:35 - And we also have as we move
13:38 - to the front you'll be able
13:40 - to see them actually wiring
13:41 - the dash.
13:42 - So we talk about a lot of
13:43 - wiring systems new
13:46 - technology what we're doing
13:48 - here is we're getting ready
13:49 - to get those things setup
13:51 - in the dash area.
14:03 - So what he's doing right
14:04 - now is we're put again
14:06 - where the cab tilts and so
14:08 - it off the frame so that
14:09 - the cab can tilt so that we
14:12 - can do any type of engine
14:13 - work for any type of fluid
14:15 - checks or access underneath
14:17 - a cab.
14:17 - So he's putting in the the
14:18 - mounts for that for that
14:20 - particular component so as
14:26 - we're coming to the end of
14:27 - our cab it you'll see a lot
14:30 - of the dashes and switches
14:33 - and gauges are in place.
14:34 - You see overhead lighting
14:36 - in place switch panels.
14:37 - Any type of electrical
14:39 - systems monitoring systems
14:41 - as well.
14:42 - If we come around towards
14:44 - the front of the unit we
14:47 - can see that our glass has
14:49 - been put in windshield
14:50 - light bars any other type
14:52 - of scene lighting turn
14:55 - signals.
14:56 - Again we're coming down to
14:57 - the end of a completed cab.
14:59 - So as we get down at this
15:00 - point obviously you'll see
15:01 - more and more things that
15:02 - are complete ball the
15:08 - larger size custom cabs you
15:10 - see.
15:11 - You'll notice we also do
15:12 - custom tailor cabs.
15:14 - So these are the cabs on
15:15 - the back of a tiller fire
15:18 - engine with a ladder on it
15:19 - so they can drive it and
15:20 - steer from the back.
15:21 - So it's a smaller version
15:23 - of what you saw front but
15:26 - they have some of the same
15:26 - features the seating air
15:28 - conditioning a type of heat
15:29 - some switches overhead
15:30 - lighting.
15:31 - Again a small single person
15:34 - to drive and steer the back
15:35 - end of a ladder truck known
15:37 - as a tiller once we've made
15:45 - it off the cab line with
15:46 - all the components
15:47 - installed.
15:48 - Basically the cab sitting
15:49 - here waiting to be mounted.
15:50 - So you'll see that the
15:51 - doors are on most of the
15:52 - switching is done.
15:54 - So all it's waiting for now
15:55 - is to be put on top of the
15:56 - chassis where it'll be
15:58 - driven out of this
15:59 - building.
16:00 - But again everything's
16:01 - ready to be be installed on
16:03 - the chassis from this point
16:04 - from what we saw on our cab
16:06 - line and all the components
16:08 - and what we have here is
16:09 - right now we're getting our
16:10 - engine ready to be
16:11 - installed.
16:12 - So we saw the cab being
16:13 - done and get ready to put a
16:14 - line before we get in or
16:17 - showing how we do our
16:17 - chassis frame rails we're
16:19 - actually setting up the
16:19 - engine and making sure that
16:21 - it's set up properly
16:23 - mounting things such as the
16:24 - alternator is getting ready
16:25 - for the transmission doing
16:27 - any type of wiring and
16:28 - hoses or belts that need to
16:29 - be done.
16:30 - Fluid fills and checks.
16:32 - So once he's done with it
16:34 - will be ready to get
16:34 - mounted on that chassis and
16:36 - ready for a cab to be
16:37 - mounted.
16:43 - A lot of the pieces that we
16:44 - saw some of the folks
16:44 - putting together our plant
16:47 - end up in our warehousing
16:48 - area here.
16:49 - So a lot of these parts
16:50 - you'll see are getting
16:51 - ready to be put on on our
16:53 - chassis.
16:53 - So we just have them all
16:55 - ready to go.
16:56 - They're all well built up
16:57 - and whatnot labeled with
16:58 - part numbers so that we can
16:59 - pull them off the shelf and
17:01 - get the mounted torch.
17:03 - Again a lot of these
17:04 - components mostly
17:04 - components are made
17:05 - in-house.
17:06 - So that's what we deal with
17:07 - when you see all of us
17:09 - fabrication in the other
17:10 - facilities so what we're
17:17 - doing here is we get our
17:18 - frame rolls we're getting
17:19 - ready for our chassis
17:20 - together.
17:21 - So our frame rails come in
17:22 - as base rails.
17:23 - We get put together come in
17:25 - here and what they're doing
17:26 - is they're setting up
17:27 - getting ready for axles or
17:29 - any type of brackets we're
17:30 - mounting that needs to be
17:31 - mounted along the for the
17:33 - chassis.
17:34 - You see some of the springs
17:38 - everything is set up so
17:40 - that they can come in and
17:41 - assemble it and attach all
17:42 - the pieces that they need
17:43 - to attach.
17:46 - So here we have an actual
17:47 - mount on those frame rails
17:48 - that we just saw.
17:50 - And what will happen after
17:51 - this once they're completed
17:52 - with the other set of or
17:53 - the other axle to go in our
17:55 - paint booth down here will
17:56 - be painted.
17:57 - We paint them any type of
17:59 - color again based on what
18:00 - the customer requires.
18:03 - Most of them are black.
18:04 - But again you'll see reds
18:06 - yellows greens anything
18:07 - that the customer would
18:09 - like to paint it again goes
18:10 - in our paint booth here.
18:11 - And then once it's done our
18:12 - paint booth we'll see it on
18:14 - the other side and see with
18:15 - the work they're doing with
18:16 - it once they're out or a
18:20 - paint booth with our
18:21 - chassis you'll start to see
18:23 - some other things
18:23 - happening.
18:24 - You'll start to see a lot
18:25 - of airlines being run and
18:27 - components for the chassis.
18:30 - There's a lot of wiring
18:31 - that needs to be done and
18:32 - wired along the frame
18:34 - rails.
18:34 - We have fuel tanks any type
18:36 - of sending units all those
18:38 - things with components of
18:40 - the chassis and if we come
18:43 - over here we'll be able to
18:45 - see a little bit further
18:46 - along with some more of our
18:48 - our wiring our sending type
18:50 - units our air systems and
18:52 - whatnot.
18:52 - So a lot of airlines a lot
18:54 - of electrical lines
18:55 - everything to make the
18:56 - chassis run again once this
19:17 - is completed it would go to
19:18 - our next spot we'll get
19:19 - ready for the engine
19:21 - mounting which we saw them
19:22 - previously setting up the
19:23 - engine so the engine's
19:24 - ready to go and be mounted
19:26 - at this point.
19:26 - We'll see that in our next
19:27 - stop so after the chassis
19:32 - is ready to at this point
19:33 - we did see the engine get
19:35 - set up a bit chassis gets
19:36 - put in or the engine gets
19:37 - put into the chassis and
19:39 - what they're doing is
19:40 - setting everything up so
19:41 - all those wires and any
19:43 - type of lines and and
19:44 - sending units and hoses
19:46 - that you saw previous we're
19:48 - setting those up and making
19:49 - things everything's
19:50 - connected and ready to
19:51 - power the chassis.
19:54 - But again we've got the
19:55 - transmission in at this
19:56 - point getting all the fluid
19:58 - lines and everything
19:59 - together.
20:00 - We also have the the
20:02 - radiator and the fans all
20:03 - mounted up as well.
20:05 - We've got batteries
20:06 - installed at this point and
20:08 - basically everything that
20:09 - we need to to push this
20:11 - chassis and here's where
20:17 - they come together.
20:18 - So we saw where we made our
20:19 - cabs.
20:20 - We saw we outfitted an
20:21 - outfit at all our cabs.
20:23 - We saw we did the chassis.
20:24 - So as these two components
20:26 - come together this is
20:28 - getting to the final
20:29 - product.
20:30 - We now have the cab mounted
20:32 - to the chassis.
20:33 - You can see the engines in
20:34 - there and ready to go and
20:35 - tucked up all the lines are
20:36 - there waiting for a fuel
20:37 - filters cabs on it or doing
20:39 - some final trim work on the
20:41 - cab.
20:42 - But when this cab is done
20:44 - and when he's done doing
20:44 - what he needs to do we can
20:45 - actually lower this cab in
20:47 - this cab.
20:47 - We'll be ready to be driven
20:48 - out of this building
20:50 - towards the next process.
20:59 - And here we have some
20:59 - bumpers being setup.
21:00 - We do numerous custom
21:02 - bumper configurations but
21:04 - you can see this is a
21:05 - bumper that they just got
21:07 - done drilling out mounting
21:08 - air horns mounting sirens
21:10 - lights running electrical.
21:12 - You have a hose.
21:13 - Well again it's based on
21:14 - whatever the the customer
21:16 - requires us to do for them.
21:18 - And then further on you'll
21:20 - see in one of the next
21:21 - steps where we'll be
21:23 - installing that custom from
21:24 - far from another vehicle.
21:25 - But again they start here.
21:27 - Everything gets mounted up
21:28 - so we can take it to the
21:29 - vehicle and mount up for
21:31 - its final final destination
21:33 - on the truck.
21:36 - So what you see is we've
21:37 - got a bumper extension
21:39 - being put on here.
21:40 - This is a obviously another
21:42 - custom bumper extension you
21:44 - can see different hose
21:45 - walls and lids.
21:46 - You can see different
21:48 - sirens and lights.
21:49 - He's putting in some eyes
21:50 - for any type of towing.
21:53 - Basically again this is one
21:54 - of the last things that
21:55 - gets done before the
21:57 - chassis and the cab roll
21:59 - out of this out of this
22:00 - building and onto the next
22:01 - spot.
22:26 - So one of the final things
22:27 - you'll see coming out of
22:28 - the building here before it
22:29 - goes on next step is it
22:30 - goes through Q A process
22:32 - our quality process so we
22:33 - have inspectors that go
22:34 - through make sure
22:35 - everything function
22:36 - properly.
22:37 - Make sure our tires as far
22:38 - as alignment are set up.
22:40 - So at this stage that's
22:41 - what they're doing here
22:42 - they're going over lists.
22:43 - They're setting things up
22:45 - before it goes out of the
22:46 - building.
22:48 - And here we get a little
22:49 - bit of a behind the scenes
22:50 - look at what goes on.
22:52 - You saw a lot of the
22:54 - electrical components and
22:55 - dash panels and want not
22:57 - being put into the
22:57 - vehicles.
22:58 - But here is where they
22:59 - actually doing some of the
23:00 - pre wiring and harnesses
23:02 - and setting things up so
23:03 - that when they're done with
23:04 - it they can go out and be
23:05 - placed in the truck and
23:06 - installed.
23:06 - So again a lot of behind
23:07 - scenes were getting things
23:09 - ready dash panel switches
23:11 - that's some of the things
23:12 - that they're doing through
23:13 - here.
23:21 - This is our main warehouse
23:22 - so you'll see a bunch of
23:24 - different things everything
23:25 - that gets put on one of the
23:26 - vehicles either in the cab
23:27 - or on the body.
23:28 - Anything from a pump to a
23:30 - real to seats to wiring
23:33 - components or whatnot.
23:34 - So a lot of logistics
23:35 - through here a lot of
23:36 - tracking everything is
23:38 - numbered and assigned based
23:40 - on a part.
23:40 - Number two what we call a
23:42 - GSO a general sales order
23:43 - fleet truck.
23:45 - So we do have a good group
23:47 - of inventory control folks
23:48 - that track all of these
23:50 - parts that you see so they
23:52 - will end up on a truck
23:53 - somewhere throughout the
23:56 - process.
24:01 - So what we're going to see
24:02 - here is what we saw before
24:05 - was basically doing our
24:06 - cabs and getting our cabs
24:08 - set up.
24:08 - So what you're going to see
24:09 - here is the back end to the
24:11 - fire vehicle really doing
24:13 - the body.
24:14 - And that's our shop where
24:16 - you can see some again some
24:17 - parts being fab we have
24:20 - brakes we've got presses.
24:21 - We help a whole lot of
24:22 - machines here where you'll
24:24 - see large sheets small
24:26 - sheets being formed and
24:27 - bent into place and sheared
24:28 - and whatnot.
24:29 - For all those components
24:30 - that that go onto a fire
24:32 - truck again pretty
24:33 - primarily basing it on the
24:35 - body of the fire truck at
24:37 - this point after we just
24:38 - saw the cab go again.
24:55 - What you're seeing a lot of
24:56 - components being formed fab
25:00 - then you see what he's
25:01 - doing right now is doing
25:03 - holders for an air bottle
25:06 - shelf.
25:06 - We'll see those later on
25:07 - the finished product.
25:08 - But again just so many
25:09 - different moving parts and
25:11 - pieces of parts that need
25:12 - to be done by hand with
25:15 - this will be is this will
25:16 - actually go into a
25:17 - compartment and you'll see
25:18 - air bottles being mounted
25:20 - for Holder for air bottles
25:21 - within the offending units.
25:22 - Some farmers will be seeing
25:26 - some of our larger
25:28 - equipment some of our
25:29 - larger shears we take some
25:31 - pieces of material larger
25:32 - pieces that again have to
25:34 - be formed and get ready for
25:37 - production for our bodies
25:38 - or some other components
25:39 - that go on a truck such as
25:41 - some bread plate walkways
25:42 - any types of others those
25:44 - types of things.
25:44 - So a lot of finger material
25:46 - getting ready for use in
25:48 - this area just as we saw in
25:53 - our cab.
25:53 - Well we're starting to wall
25:55 - the back of fire truck is
25:57 - the body for the body gets
25:58 - put together here.
25:59 - Based on all those pieces
26:00 - that you saw being formed
26:02 - before and all the
26:03 - componentry so the body
26:05 - gets put into a jig gets
26:06 - set up.
26:08 - They measure it put
26:09 - everything together and
26:10 - they start welding
26:11 - compartments like the farm
26:13 - or whatever configuration
26:14 - is needed on the body.
26:16 - Again it's the same setup
26:17 - as you saw below where we
26:18 - put together in a cab.
26:20 - Well them together and
26:21 - we'll go through and see
26:22 - the next step as a sort of
26:40 - body weld process you'll
26:41 - see a side of a compartment
26:42 - a lower size department.
26:43 - So this has already been
26:44 - welded in another area.
26:46 - It hasn't brought over
26:48 - everything kind to be
26:49 - pieced together at this
26:50 - point.
26:51 - So we see what someone else
26:52 - as well that we can work
26:54 - our way down into one of
26:56 - the other areas where you
26:57 - can see we're actually
26:58 - starting to piece them
26:59 - together side to side
27:00 - getting them ready.
27:02 - What he's doing is just
27:03 - doing some final welding to
27:04 - put the body together.
27:07 - Take as it gets filled up
27:08 - from piece of piece from
27:10 - the ground up.
27:12 - We continue on over to the
27:13 - other side where after
27:15 - we've got the body put
27:16 - together we now start to
27:18 - see it taking place with
27:20 - all the sides and we got
27:21 - together we can see ladder
27:23 - boxes that are now being
27:24 - well put in.
27:26 - We have all this department
27:27 - patient that's done some of
27:30 - those air bottom
27:30 - compartments that we've
27:31 - talked about where he was
27:32 - just doing in the fab shop.
27:34 - We'll fit in there but it's
27:36 - coming together and as we
27:37 - actually go through with
27:39 - everything as far as
27:40 - welding we'll do the same
27:41 - process as we did before
27:43 - going through making sure
27:44 - that all welds are ground
27:45 - down.
27:46 - And we have nice smooth
27:47 - areas that we can primer
27:49 - and get ready to paint so
28:13 - again before we get to our
28:14 - next step which is a primer
28:15 - prior to paint how we've
28:17 - gone through we've browned
28:18 - down any type of wealth
28:19 - marks any type of deferring
28:21 - that needed to be done.
28:22 - So this body is a little
28:24 - bit more to go both fully
28:25 - ready to go into primer and
28:27 - then for primer to paint
28:35 - getting that nice smooth
28:36 - surface.
28:37 - Once they're done with this
28:38 - they'll go window climb one
28:49 - of the bodies that had just
28:49 - been painted again another
28:51 - fire truck red popular
28:52 - color.
28:53 - But you can see it's been
28:54 - painted.
28:55 - What he's doing right now
28:56 - is going over buffing it
28:57 - getting that nice block
28:59 - making sure there's no
28:59 - imperfections.
29:00 - You also take notice too
29:03 - that we have the interiors
29:04 - painted the interiors have
29:06 - a bunch of different
29:07 - options work we painted
29:08 - just like this outside or
29:10 - have a texture type finish
29:12 - or more protective type
29:13 - coating to the compartment
29:14 - here.
29:15 - So that's also been done.
29:16 - So again we go through here
29:18 - we make sure that we have a
29:19 - good finish that we'd like
29:21 - to see on it we forfeit.
29:23 - Make sure it's ready go
29:24 - next step after this.
29:26 - We'll take it down and
29:27 - we'll get ready to have it
29:28 - mounted where it meets up
29:29 - with the chassis.
29:31 - This is one of our laser
29:32 - cutters one of the state of
29:34 - the art piece of equipment
29:35 - that we have here.
29:37 - What happens is we'll run a
29:38 - computer program to punch
29:39 - out all those parts
29:40 - opponents that we've seen
29:42 - being put on the truck.
29:44 - So the program gets put in
29:46 - to run it and the machine
29:48 - basically we feed the piece
29:50 - of material in it.
29:51 - And it's doing what they
29:52 - call nesting.
29:52 - So you take a piece of
29:54 - material aluminum stainless
29:56 - steel and whatnot and it
29:58 - will actually calculate how
29:59 - many different cutouts that
30:01 - you can get on that piece.
30:03 - So there's very very
30:04 - minimal waste to it.
30:06 - Again just something to
30:07 - make it more efficient is
30:09 - also very accurate and just
30:13 - kind favor.
30:14 - What we do here and as you
30:21 - come over here you'll
30:23 - actually be able to see the
30:25 - the screen in the display.
30:27 - So this was programmed in
30:29 - so you'll see exactly what
30:31 - it's cutting in and how
30:33 - it's doing it sort of move
30:34 - along again taking
30:35 - advantage of using a full
30:36 - sheet to use as much
30:39 - material less waste lost so
30:46 - what we have was we have a
30:47 - completed body where
30:48 - everything's painted and
30:50 - ready to go.
30:51 - The rough edges that you
30:52 - see here are left that way
30:54 - for an adhesive for what we
30:56 - call Chevron material which
30:58 - isn't FDA compliant to
30:59 - stick to.
31:00 - So this body is ready to be
31:01 - mounted.
31:02 - We also have our cap which
31:03 - we again saw cab being
31:05 - built in our cab line.
31:06 - This is where they come
31:07 - together.
31:07 - This happens to be a ladder
31:09 - truck.
31:10 - So we do ladder trucks as
31:11 - well with our ladders being
31:12 - built in Roanoke Virginia.
31:14 - What you'll see coming
31:15 - through and over to the
31:16 - other side is they're
31:17 - actually getting ready to
31:19 - mount a body right now and
31:30 - as you'll see they'll hoist
31:31 - the section the body get it
31:33 - ready to be put in place.
31:35 - Once they have it put where
31:37 - they need it to be put
31:38 - where they have some
31:39 - predetermined mounts one
31:40 - knot they'll set it down
31:41 - there again in place and
31:42 - continue securing it
31:44 - fasting in according to all
31:53 - those materials that we saw
31:54 - working up above on a body
31:56 - and chassis are now coming
31:57 - together there's a water
32:13 - tank that we're getting
32:13 - ready to install we
32:14 - purchase our water tanks
32:16 - from an outside vendor.
32:17 - But water tanks range in
32:18 - size from anything from 250
32:20 - gallons up to three
32:21 - thousand gallons this
32:22 - particular one has foam and
32:25 - water.
32:26 - So they're actually getting
32:27 - ready to have it installed
32:29 - in one of the bodies that
32:30 - we just saw.
32:31 - That was done.
32:32 - So again a lot of trucks
32:35 - that we deal have water
32:36 - tagged water tank various
32:38 - sizes and we design
32:40 - everything the tank around
32:42 - the fire truck that we're
32:43 - building this is one of the
32:48 - bodies that just amounted
32:49 - to one of our coffee.
32:50 - So what we're doing now is
32:52 - securing the body but also
32:55 - finishing up putting any
32:57 - type of wiring and hoses
32:59 - running any type of lines
33:00 - that need to the tank that
33:01 - we just saw is made for
33:03 - this unit.
33:03 - So they're getting ready to
33:04 - have that tank put into
33:06 - this unit.
33:07 - So once the body and the
33:09 - cab have been put together
33:10 - you see that we don't have
33:12 - any plumbing on it which is
33:13 - in the middle what we'll
33:14 - see very shortly.
33:16 - But when this is completed
33:17 - in this building this is
33:18 - actually ready to be driven
33:20 - to the next assembly point
33:22 - which is the plumbing then
33:24 - where it'll be finished out
33:25 - and we'll finally start
33:26 - seeing the whole firetruck
33:35 - as we just saw.
33:36 - Now leave a truck with a
33:38 - water tank mounted into the
33:39 - pump mounted the cab and a
33:40 - body.
33:41 - And in this section our
33:42 - plumbing section we
33:43 - actually start to plumb the
33:46 - fire pump of the vehicle so
33:48 - the fire pump gets mounted
33:49 - and you can see all the
33:50 - different configurations of
33:52 - valves piping and whatnot.
33:55 - There's a lot of debt what
33:56 - they call discharges that
33:58 - go to a fire truck that
33:59 - allows you to squirt the
34:00 - water through the hoses
34:01 - things called intakes that
34:02 - let water come in to the
34:05 - truck as well.
34:06 - If we come over this side
34:07 - you'll see a truck that
34:07 - just came in where they're
34:09 - actually getting ready and
34:10 - get set up to put a lot of
34:11 - the valve pump palaces are
34:13 - made here as well so we
34:15 - have the frame that fits
34:17 - around the pump that
34:17 - carries the hoses things
34:19 - that call boss laser speed
34:20 - Lay's booster rails
34:21 - generators.
34:23 - Any of those types of
34:23 - things in the back you can
34:25 - see one of the water tanks
34:26 - that we saw before now
34:28 - that's mounted into a
34:29 - truck.
34:29 - Again the water tank will
34:30 - be plumbed to the pump
34:33 - where again we'll be ready
34:34 - for fire service.
34:38 - So we're in one of our
34:38 - final assembly or is now
34:40 - but we just saw some of the
34:41 - plumbing in the piping
34:42 - being done so you can kind
34:43 - of get a good look of what
34:45 - they've accomplished in
34:46 - there as far as running
34:47 - lines discharges and
34:48 - whatnot as we're still in
34:50 - this final assembly period.
34:52 - We still have wiring and
34:53 - all the final things that
34:54 - we do that goes on the fire
34:57 - truck again all customer
34:58 - specific.
35:00 - You can see the plumbing
35:03 - the piping the speed that
35:05 - we use where the hoses get
35:06 - deployed.
35:06 - This is what they call a
35:07 - top mount pump where the
35:09 - operator stands on top and
35:10 - works the control panels
35:13 - that the pump from the from
35:14 - the top over here we'll see
35:17 - a panel lay out so all of
35:19 - our panels are done
35:20 - in-house as well.
35:21 - So all these are all the
35:22 - gauges all the gauges are
35:23 - set up for the pump for the
35:24 - pressures and whatnot to
35:27 - let the pump operate know
35:28 - different pressures and how
35:29 - the pumps operating.
35:30 - But again all this gets put
35:32 - on the units in the final
35:34 - production area this is
35:40 - just some of the final
35:40 - things that are getting put
35:41 - on this unit to be
35:43 - completed.
35:44 - One of the things we're
35:45 - looking at is an air bottle
35:46 - store.
35:46 - We did see them fabricating
35:49 - and bending those pieces of
35:51 - material to get installed
35:52 - in their truck like this
35:53 - again compartments are
35:55 - painted with a specific
35:56 - interior cover color and
35:58 - coating.
35:59 - We're putting some shelving
36:00 - material in there and just
36:02 - finalizing the lights step
36:06 - final trim packages with
36:07 - tread plate and whatnot as
36:10 - we come around the back.
36:12 - You can also see where
36:13 - they'll be assembling the
36:14 - hose bed and access to that
36:17 - hose bed area where the
36:18 - hose gets stored.
36:20 - All types of lights and
36:21 - again just customer
36:23 - specific as far as what
36:25 - goes on each one of our
36:27 - trucks one of the items
36:36 - that we saw in our cab line
36:37 - being built was really
36:38 - reference to Tiller cab.
36:40 - This is a tiller cabin
36:41 - production Tiller cab
36:43 - again.
36:43 - The operator is in the back
36:46 - and steers the back of the
36:47 - ladder truck Tiller meaning
36:49 - tractor drawn area aerial
36:51 - or TDA.
36:52 - We do have various
36:54 - complement of ladders or
36:55 - ladders are built on our
36:56 - other facility in Roanoke
36:57 - Virginia and sent up here.
36:59 - So here you see a lot of
37:00 - this being mounted.
37:01 - They are putting the final
37:02 - touches onto this unit.
37:03 - You can see where Mike's
37:04 - doing some striping on the
37:06 - doors.
37:07 - Again customer specific and
37:10 - per NAFTA National Fire
37:12 - Protection Administration.
37:14 - As far as what we're
37:15 - supposed to do to keep the
37:16 - firefighters safe and what
37:18 - we need to do with the
37:18 - vehicle.
37:19 - So final touches on a very
37:20 - large piece of apparatus
37:22 - known as a TDA there's
37:30 - another vehicle that we're
37:31 - getting ready to final and
37:32 - deliver to a customer.
37:34 - But as you'll see we have
37:35 - all the warning devices
37:37 - mounted all types of seen
37:38 - lights.
37:39 - We do have some lettering
37:40 - applied to it.
37:42 - We're going through the
37:42 - final testing phases right
37:44 - now.
37:46 - We do have the pump panels
37:48 - as you'll see down this
37:49 - way.
37:50 - We have our panels on the
37:51 - control panel we saw top
37:53 - mounted pump panel before.
37:55 - This is a side mounted
37:56 - panel.
37:56 - So this is where the pump
37:57 - operator will go to operate
38:00 - the pump in the water
38:00 - system of the truck moving
38:03 - down through.
38:04 - Again you'll see a lot of
38:05 - different shelving
38:07 - configuration withdraws and
38:09 - whatnot.
38:10 - Again all custom done some
38:13 - of the trays roll out trays
38:18 - one of the things that we
38:19 - saw being manufactured and
38:21 - done up at our fab shop is
38:22 - a light box holder cord
38:24 - rails.
38:25 - So there's just a lot of
38:26 - things that get put on a
38:27 - vehicle just in what you
38:29 - see the shell the firetruck
38:35 - if you remember as talking
38:36 - we saw a body was being
38:37 - ready to be mounted with
38:38 - that white chalky material
38:40 - in the back.
38:40 - We said we left it roughed
38:41 - up for an application what
38:43 - we call Chevron. This is
38:45 - Chevron.
38:45 - So it's a reflective
38:46 - material that is required
38:48 - to be on the back of
38:49 - emergency vehicles so you
38:50 - can see oncoming passengers
38:53 - can see the vehicle.
38:55 - So we have a lot of lights
38:56 - and everything on a truck
38:57 - but this helps visibility
38:59 - as well.
38:59 - So again a lot of stuff
39:01 - going on as far storage
39:03 - compartments for ladders
39:04 - suction discharges step
39:08 - just an overall full
39:12 - complement apparatus.
39:19 - This unit has just been
39:20 - completed and ready to go
39:21 - out for a final detailing
39:23 - and lettering.
39:24 - I just want to point out
39:25 - that this is a commercial
39:26 - chassis vehicle.
39:27 - So we do a full complement
39:29 - of commercial chassis
39:29 - vehicles that are put on a
39:32 - cab that has not been made
39:35 - by us.
39:35 - So again not the majority
39:38 - of our things that are
39:38 - built here are custom cabs
39:41 - that you've seen being
39:41 - built.
39:42 - But we also do those where
39:43 - we order the chassis and
39:45 - the back end gets put
39:46 - together and built just
39:47 - like we saw before.
39:48 - So it's a custom back in on
39:51 - a commercial chassis.
39:55 - We're not forecasting going
39:56 - right now here but what we
39:59 - do is we set up the bar
40:01 - truck that we put on a full
40:03 - load of electrical so we
40:04 - turn all the lights on and
40:06 - make sure that all the
40:07 - electrical property
40:09 - properly.
40:10 - We also run for a contest
40:12 - real see water being
40:13 - drafted out of an
40:15 - underground water storage
40:17 - area.
40:18 - I've just been in this
40:19 - argues that our love for
40:25 - the pump is tested at
40:26 - different price again based
40:28 - on NSA reform.
40:31 - And it's also being third
40:32 - party affected by this Dr.
40:35 - verify that all the past
40:37 - have been completed and
40:38 - that the U.S. One of the
40:50 - other things that you'll
40:51 - notice if you look above it
40:52 - you'll see the yellow line
40:54 - yellow piping.
40:56 - That is a water test all of
40:59 - our vehicles.
41:00 - We actually simulate a
41:01 - brain or water event to
41:03 - make sure that we have no
41:04 - leaks.
41:05 - The window for any air
41:06 - conditioning or anything
41:07 - like that.
41:08 - So the unit will go through
41:09 - that and all the water from
41:12 - the side just to verify
41:14 - that we don't have it is
41:15 - for the so we're on our
41:19 - customer service building.
41:20 - We also have a building
41:21 - where we do service work
41:23 - for local customers or any
41:25 - customers anybody that has
41:27 - an issue.
41:28 - We can bring it back here
41:28 - service it do any type of
41:30 - warranty work.
41:31 - We have all the state of
41:32 - the art service equipment
41:33 - to do such and diagnostics
41:35 - and technicians.
41:37 - So again just another
41:38 - element of being able to
41:40 - service our customers so
41:46 - we're in our graphics
41:47 - facility right now.
41:48 - We have machines that do
41:50 - various graphics various
41:53 - materials.
41:55 - We can do gold leaf.
41:56 - We can do scotch light
41:58 - again whenever that
41:58 - customer preference is.
42:00 - You can see over here
42:01 - another machine that we've
42:01 - got.
42:02 - We're actually doing some
42:03 - custom logos for the
42:06 - foreman and in the
42:08 - background here you can see
42:09 - a unit that we've just got
42:11 - done lettering and striping
42:13 - for a customer.
42:15 - So this is the 22 carat
42:16 - gold leaf along with
42:19 - reflects reflect the
42:21 - material scotch light.
42:23 - So just a nice complement
42:24 - of of a fire department
42:26 - showing pride for their
42:27 - fire department in their
42:28 - community.
42:29 - Again we do all that
42:30 - lettering on striping
42:31 - in-house here with our
42:32 - graphics department we're
42:40 - still on with our graphic
42:41 - arts department.
42:42 - So as you can see our
42:43 - graphic artist can generate
42:45 - any type of logo custom to
42:48 - a fire department specific
42:49 - logo or as simple as just
42:52 - plain letters.
42:53 - Right now she's running a
42:54 - KME logo.
42:55 - So you see it running
42:56 - through on the material and
42:59 - come out we'll get it ready
43:00 - for application where it
43:01 - needs to go so here we are
43:05 - with one of our final
43:06 - products.
43:06 - As you can see everything's
43:07 - operating nice and shiny
43:10 - and lights working, ready
43:11 - to go for customers to come
43:13 - and inspect and take it
43:13 - home and serve the
43:14 - community that we built it
43:15 - for just like to take this
43:17 - opportunity.
43:17 - Thank you for joining us on
43:18 - our tour on behalf of all
43:20 - of us at KME Fire.
43:23 - Thanks for coming and
43:24 - watching and hope to...
43:24 - See you sometime soon.